LogoSolarGrid
See Your Roof's Estimate
Arizona · Nevada · New Mexico
Est. 2014

25-Year PowerGuarantee.Installed in 11 Days.

Every conduit labeled. Every microinverter mapped. Every kilowatt-hour accounted for before the permit inspector arrives — or we fix it free.

See Your Roof's Estimate
No form. Instant estimate.
847+
Systems Installed
14.2MW
MW Total Capacity
99.3%
Permit Pass Rate
MICROINVERTERUTILITY METER↺
Live Output
48.3 kW
↓ 91% grid draw
NABCEP Certified Installers◆IEC 62446 Compliant Documentation◆Tier-1 Panel Manufacturers Only◆UL 1741 SA Certified Inverters◆Net Metering Filed Day-1◆AHJ Permit Approval Guaranteed◆LEED v4.1 Compatible◆110% Production or We Pay◆NABCEP Certified Installers◆IEC 62446 Compliant Documentation◆Tier-1 Panel Manufacturers Only◆UL 1741 SA Certified Inverters◆Net Metering Filed Day-1◆AHJ Permit Approval Guaranteed◆LEED v4.1 Compatible◆110% Production or We Pay◆

Every objection, answered in writing.

Three guarantees. Three documents. Three reasons the only remaining action is clicking the estimate button.

Guarantee 01
25 Years
Panel Performance Warranty — Backed by Manufacturer Spec

We install only Tier-1 panels rated for 25-year linear power output degradation of ≤0.5%/year. The warranty is manufacturer-backed, not a contractor promise — meaning it survives us, survives ownership transfers, and survives the next two property managers.

Panel ManufacturerQ CELLS / REC Alpha
Power Degradation≤0.5% / year
Year 25 Output≥87.5% rated power
Warranty TransferFully assignable
CertificationIEC 61215 / IEC 61730
Spec sheets and warranty documents delivered in your permit package. Your inspector gets the same paperwork your lawyer would want.
See Your Roof's Estimate
Guarantee 02
110%
Production Guarantee — We Pay the Difference

Your system is sized using 10 years of TMY3 irradiance data for your specific coordinates. If annual production falls below the modeled baseline, we issue a credit check for the shortfall at your utility's retail rate. Not a discount. A check.

Baseline ModelPVWatts v8 + TMY3
MonitoringEnphase Enlighten (live)
True-Up PeriodAnnual (calendar year)
Shortfall RateYour retail $/kWh
Payout MethodCheck within 30 days
Sample true-up: 48 kW system modeled at 72,400 kWh/yr. If it produces 71,000 kWh, we cut a check for 1,400 kWh × your utility rate.
See Your Roof's Estimate
Guarantee 03
$0 Down
Out-of-Pocket With Approved Financing — Day 1 Savings

PACE financing, C-PACE for commercial assets, or solar-specific term loans mean you start saving the month the system energizes — before you've written a single check. Typical commercial clients see positive cash flow in Month 1.

C-PACE AvailableAZ, NV, NM commercial
Typical APR5.49% – 7.25%
Term Options10 / 15 / 20 / 25 yr
ITC Benefit (2026)30% federal tax credit
Avg. Month-1 Δ+$680 net positive
A 350 kW warehouse system: $0 down, $4,200/mo financing, utility bill drops from $11,400 to $2,100. Net Month-1 savings: $5,100.
See Your Roof's Estimate

11 days. Not 11 months.

Average residential install: 8.4 days. Commercial: 11.2 days.
Day 1

Site Survey & System Design

Structural engineer assesses roof load. Shade analysis via drone LiDAR. Array layout finalized in SolarEdge Designer. Permit drawings stamped.

[SURVEY_COMPLETE]
01
Days 2–3

Permit Filing & Utility Interconnection

AHJ permit submitted same day as survey sign-off. Utility interconnection application filed in parallel — not after permit approval. Most clients wait 0 extra days.

[PERMIT_FILED]
02
Days 4–7

Racking, Panels & Conduit Run

L-foot mounts torqued to 25 ft-lbs. Rails leveled within 1/8". Panels landed and grounded. Every conduit labeled with circuit ID and wire gauge. No label, no close-out.

[INSTALL_ACTIVE]
03
Day 8

Microinverter Mapping & Commissioning

Each Enphase IQ8 unit scanned, serial-mapped to its panel position in Enlighten. System energized in test mode. Production verified against model within ±3%.

[COMMISSIONING]
04
Days 9–10

Inspection & Punch List

AHJ final inspection scheduled. Our crew stays on-site. Any inspector correction addressed same day — our 99.3% first-pass rate means this is rarely needed.

[INSPECTION]
05
Day 11

Permission to Operate — Meter Spins Backward

Utility issues PTO. System switches to full production mode. You receive your Enlighten login, your warranty package, and your first kWh report.

[PTO_GRANTED ✓]
06

Real systems. Real kilowatt-hours.

Production figures pulled from Enphase Enlighten. Savings calculated at each client's actual utility rate.

0+
Systems Installed
Since 2014
0 kW
Total Capacity
Across all projects
0.3%
Permit Pass Rate
First inspection
0M+
kWh Generated
This calendar year
Large commercial warehouse rooftop with solar panels installed in neat rows against desert sky
94% bill ↓
Warehouse / Distribution
Mesa Commerce Center
System Size
348 kW
Annual Output
524,000 kWh/yr
Annual Savings
$68,200 / yr
Simple Payback
4.1 yrs
Mesa, AZ · 812 panels
Modern office building with rooftop solar panels and blue sky backdrop in desert setting
71% bill ↓
Medical Office / LEED Gold
Scottsdale Medical Plaza
System Size
127 kW
Annual Output
191,000 kWh/yr
Annual Savings
$24,800 / yr
Simple Payback
5.8 yrs
Scottsdale, AZ · 298 panels
Residential home with black solar panels on roof under clear Arizona sky
108% bill ↓
Single-Family / Net-Zero
Hendricks Residence
System Size
14.4 kW
Annual Output
21,600 kWh/yr
Annual Savings
$3,200 / yr
Simple Payback
5.2 yrs
Flagstaff, AZ · 36 panels

Three kinds of clients. One standard of work.

Client 01

Operations Managers

Mid-Size Commercial Buildings
The Problem

“Utility invoices climbing 8–12% annually with no ceiling in sight.”

Lock in your kWh cost for 25 years. C-PACE means no capex approval fight.

  • Full interconnection agreement handled by us
  • Enphase monitoring dashboard for facilities team
  • Prorated production reports for board presentations
  • Maintenance SLA included years 1–5
94%avg. utility bill reduction
Get Your Estimate
Client 02

Homeowners

Bill-Shock Ready to Act
The Problem

“Got a $14,000 true-up and finally snapped. Every month is a new record.”

$0 down. Month 1 net savings. 25-year warranty that outlasts your mortgage.

  • System sized to your last 12 months of usage
  • Permit pulled in your name — fully transferable
  • Net metering enrollment handled same week
  • Financing pre-approval in 24 hours
5.4 yrsavg. residential payback
Get Your Estimate
Client 03

Property Developers

LEED Certification & Interconnection
The Problem

“Need interconnection agreements filed yesterday. LEED point deadline is real.”

We've filed 340+ interconnection applications. LEED documentation package delivered with permit set.

  • LEED v4.1 EA Credit documentation included
  • Interconnection filed in parallel with AHJ permit
  • As-built drawings in AutoCAD and PDF
  • Commissioning report for LEED submittal
340+interconnection agreements filed
Get Your Estimate
The Only Remaining Action

Your roof is generating$0 right now.

Enter your address. We'll show you the exact system size, projected annual output, and Month-1 net savings — before you talk to anyone.

🔒No form. Address only.
⚡Estimate in 60 seconds
📋25-yr warranty included
✓99.3% permit pass rate