25-Year PowerGuarantee.Installed in 11 Days.
Every conduit labeled. Every microinverter mapped. Every kilowatt-hour accounted for before the permit inspector arrives — or we fix it free.
Every objection, answered in writing.
Three guarantees. Three documents. Three reasons the only remaining action is clicking the estimate button.
We install only Tier-1 panels rated for 25-year linear power output degradation of ≤0.5%/year. The warranty is manufacturer-backed, not a contractor promise — meaning it survives us, survives ownership transfers, and survives the next two property managers.
Your system is sized using 10 years of TMY3 irradiance data for your specific coordinates. If annual production falls below the modeled baseline, we issue a credit check for the shortfall at your utility's retail rate. Not a discount. A check.
PACE financing, C-PACE for commercial assets, or solar-specific term loans mean you start saving the month the system energizes — before you've written a single check. Typical commercial clients see positive cash flow in Month 1.
11 days. Not 11 months.
Site Survey & System Design
Structural engineer assesses roof load. Shade analysis via drone LiDAR. Array layout finalized in SolarEdge Designer. Permit drawings stamped.
Permit Filing & Utility Interconnection
AHJ permit submitted same day as survey sign-off. Utility interconnection application filed in parallel — not after permit approval. Most clients wait 0 extra days.
Racking, Panels & Conduit Run
L-foot mounts torqued to 25 ft-lbs. Rails leveled within 1/8". Panels landed and grounded. Every conduit labeled with circuit ID and wire gauge. No label, no close-out.
Microinverter Mapping & Commissioning
Each Enphase IQ8 unit scanned, serial-mapped to its panel position in Enlighten. System energized in test mode. Production verified against model within ±3%.
Inspection & Punch List
AHJ final inspection scheduled. Our crew stays on-site. Any inspector correction addressed same day — our 99.3% first-pass rate means this is rarely needed.
Permission to Operate — Meter Spins Backward
Utility issues PTO. System switches to full production mode. You receive your Enlighten login, your warranty package, and your first kWh report.
Real systems. Real kilowatt-hours.
Production figures pulled from Enphase Enlighten. Savings calculated at each client's actual utility rate.



Three kinds of clients. One standard of work.
Operations Managers
“Utility invoices climbing 8–12% annually with no ceiling in sight.”
Lock in your kWh cost for 25 years. C-PACE means no capex approval fight.
- Full interconnection agreement handled by us
- Enphase monitoring dashboard for facilities team
- Prorated production reports for board presentations
- Maintenance SLA included years 1–5
Homeowners
“Got a $14,000 true-up and finally snapped. Every month is a new record.”
$0 down. Month 1 net savings. 25-year warranty that outlasts your mortgage.
- System sized to your last 12 months of usage
- Permit pulled in your name — fully transferable
- Net metering enrollment handled same week
- Financing pre-approval in 24 hours
Property Developers
“Need interconnection agreements filed yesterday. LEED point deadline is real.”
We've filed 340+ interconnection applications. LEED documentation package delivered with permit set.
- LEED v4.1 EA Credit documentation included
- Interconnection filed in parallel with AHJ permit
- As-built drawings in AutoCAD and PDF
- Commissioning report for LEED submittal
Your roof is generating$0 right now.
Enter your address. We'll show you the exact system size, projected annual output, and Month-1 net savings — before you talk to anyone.